Event#:442
Date: 2016-10-22
Agency:State Parks
Trail: Staircase Beach
Leader:Jerry Mitcham
Hours: 138
Volunteers:23
Distance:380
Status: Completed
Regulars: 6
Casuals: 17
pdf:20161022StaircaseBeach.pdf
CSUCI: 17
Tag:Other,CSUCI
Previous Events
ID Date Leader Hours
4562017-01-04Jerry Mitcham15.0
4422016-10-22Jerry Mitcham138.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Dave Perlmutter6.00
George Sherman6.00
Jerry Mitcham6.00
John Kross6.00
This was a follow-on trail maintenance project. The work needed is now complete. A total of 17 CSUCI student volunteers were present, in addition to 6 SMMTC regular volunteers and crew leaders.. Volunteers met at the parking area for the Staircase Beach. We split into 4 groups and proceeded to the trailwork areas. The following work was completed: - Widened 100 feet of the lower section of the trail - Built two rock walls to fix washouts on the lower section of the trail - Lopped and brushed 100 feet around the middle section of the trail - Filled, with road base, ditches in the first 180 feet of trail Total Volunteer Hours: 23 volunteers @ 6 hours = 138 Hours Feet of trail Maintained: 380 feet + 2 rock walls