Event#:447
Date: 2016-11-19
Agency:State Parks
Trail: Scenic Trail
Leader:Jerry Mitcham
Hours: 130
Volunteers:26
Distance:350
Status: Completed
Regulars: 8
Casuals: 18
pdf:20161119ScenicTrail.pdf
CSUCI: 17
Tag:PMSP,CSUCI
Previous Events
ID Date Leader Hours
7492020-05-30Dave Edwards60.0
4472016-11-19Jerry Mitcham130.0
3632015-11-07Barry Dydyk144.0
3552015-10-10Jerry Mitcham234.0
Crew Member Hours
Barb Thomas5.00
Don Brusselars5.00
George Sherman5.00
Greg Sweel5.00
Jerry Mitcham5.00
John Kross5.00
Norm Simmonds5.00
Sharon Simmonds5.00
This was a scheduled project with students of CSUCI. The object of the project was to perform routine trail maintenance on the Scenic Trail. There were 17 CSUCI students and 9 SMMTC volunteers present. Met at the day use parking lot of the Sycamore Canyon Campground. Held introductions, project briefing, tool talk and safety briefing. Hiked to the trailhead. Began work. Work was exclusively tread work to repair the extensive erosion that has occurred on this trail. We installed 9 new drains and cleaned out several existing drains. On the upper portion of the trail, we installed several check dams in the existing large trench in the trail. On the lower portion of the trail we moved in a large amount of soil to fill the large trench. Completed work. Hiked back to the meeting place. Total volunteer hours: 26 Volunteers x 5 hours = 130 hours Feet of trail maintained: 350