Event#:472
Date: 2017-03-18
Agency:COSCA
Trail: COSCA Spring Work Day
Leader:John Kross
Hours: 72
Volunteers:12
Distance:2770
Status: Completed
Regulars: 10
Casuals: 2
pdf:20170318COSCASpring.pdf
CSUCI: 0
Tag:
Previous Events
ID Date Leader Hours
6312019-04-06John Kross20.0
6282019-03-16John Kross32.0
6292019-03-13John Kross12.0
4722017-03-18John Kross72.0
3912016-03-19Jerry Mitcham60.0
3092015-03-21Jerry Mitcham55.0
3082015-03-19Jerry Mitcham12.0
Crew Member Hours
Anne Russell4.00
Barry Dydyk4.00
Dave Edwards4.00
Don Brusselars4.00
George Sherman4.00
Greg Sweel4.00
Jerry Mitcham4.00
John Kross4.00
Norm Simmonds4.00
Sharon Simmonds4.00
Annual Spring Trail Work event during which Trails Council crew leaders survey and flag work areas prior to the event and lead crews on the day of the event. Volunteers met at the Conejo Canyons trailhead on Conejo Center Drive. After registration, at 8a.m. volunteers were divided into teams that ranged between 6 and 14 people, were assigned their tools, and hiked to their designated work area. The following work was completed: Team 1: Filled-in severely eroded ~50 foot section of trail Built rock wall and improved drainage to prevent future erosion Team 2: Cut in trail re-route to get around a very muddy creek area ~400 feet Team 3: Brushed, removed slough, widened bench in places in order to bring trail back to min. 4 feet of bench width (this is an equestrian trail) ~800 feet Team 4: Filled in trenched areas, cut in or restored 8 water bars ~1,500 feet Additional work accomplished Filled in deep trench at the junction of Hawk Cny trail and Hawk Cny fire road ~20 feet Work completed, everyone hiked back for a lunch provided by COSCA rangers. Total Volunteer Hours: 65 volunteers 4 hours = 260 Hours Feet of trail Maintained: 2,770 feet