Event#:498
Date: 2017-06-14
Agency:NPS
Trail: Saddle Peak - Spanish Broome
Leader:Jerry Mitcham
Hours: 42
Volunteers:7
Distance:0
Status: Completed
Regulars: 5
Casuals: 2
pdf:20170614SaddlePeak.pdf
CSUCI: 0
Tag:SPSB
Previous Events
ID Date Leader Hours
6572019-06-19Jerry Mitcham36.0
5682018-06-20Jerry Mitcham24.0
4982017-06-14Jerry Mitcham42.0
4622017-01-25Jerry Mitcham12.0
3442015-07-25Jerry Mitcham46.0
3112015-03-25Jerry Mitcham6.0
1682013-08-1718.0
1562013-07-2019.5
1552013-06-2925.0
1282013-02-2330.0
1222013-01-1930.0
1192012-12-1524.0
1022012-11-2124.0
1132012-11-037.0
1112012-10-2712.0
782012-09-2224.0
732012-08-2518.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Jerry Mitcham6.00
Norm Simmonds6.00
Sharon Simmonds6.00
This was a scheduled project. The object of this project was to perform Spanish Broom removal on Saddle Peak. There were 6 SMMTC volunteers present. Met at the BBT trail head on Stunt Road. Held tool talk and safety briefings. Two volunteers hiked to the peak, while the other four road in the vehicle. On the peak, we treated approximately 3 acres of infested area using the “cut and paint” technique. As expected, there was a significant amount of broom in the area, but still at an easily manageable level. We treated the flat area on top of the peak as well as the lower level and alongside the road leading in from the property line. There is still broom to be treated on the southern and eastern slopes and in the meadow above the large water tank... .Finished work and hiked/drove back to the meeting place. Completed the day’s project. Total volunteer hours: 6 Volunteers x 6 hours = 36 hours Feet of trail maintained: NA