Event#:537
Date: 2018-01-13
Agency:NPS
Trail: BBT Kanan Towards Latigo
Leader:Jerry Mitcham
Hours: 114
Volunteers:19
Distance:4700
Status: Completed
Regulars: 8
Casuals: 11
pdf:20180113KananBBTEast.pdf
CSUCI: 0
Tag:BBT
Previous Events
ID Date Leader Hours
5372018-01-13Jerry Mitcham114.0
3962016-04-02John Kross96.0
Crew Member Hours
Anne Russell6.00
Bill Dinino6.00
Dave Edwards6.00
Dave Perlmutter6.00
George Sherman6.00
Jerry Mitcham6.00
John Kross6.00
Norm Simmonds6.00
Steve Clark6.00
This project was a joint project with CORBA. The objective was routine trail maintenance on the section of the BBT East of the Kanan Dume Road Trailhead. The trail had been previously surveyed and flagged. There were 19 volunteers present. Met at the parking lot at the Kanan Dume Road trailhead. Conducted safety and tool talk. Hiked approximately one tenth of a mile to the worksite. Began work above the tunnel. At the worksite, conducted tool talk and safety briefing. We used the gas powered brush cutter to trim brush alongside the trail. The heavier brush and overhanging limbs were lopped by hand. Cleaned out 44 drains and constructed 16 new drains. Total volunteer hours: 19 Volunteers x 6 hours = 114 hours Feet of trail maintained: 4,700