Event#:541
Date: 2018-01-27
Agency:State Parks
Trail: BBT Trail Saddle Peak Connector
Leader:Jerry Mitcham
Hours: 60
Volunteers:10
Distance:2100
Status: Completed
Regulars: 7
Casuals: 3
pdf:20180127StuntConnector.pdf
CSUCI: 0
Tag:BBT
Previous Events
ID Date Leader Hours
5412018-01-27Jerry Mitcham60.0
Crew Member Hours
Barb Thomas6.00
Bill Dinino6.00
Dave Edwards6.00
Don Brusselars6.00
George Sherman6.00
Jerry Mitcham6.00
Norm Simmonds6.00
This was a scheduled trail maintenance project. The objective was routine trail maintenance on the section of the BBT from the Stunt Road Connector uphill toward Saddle Peak. The trail had been previously surveyed. There were 10 volunteers present (nine adults and one minor (who worked very hard)). Hiked approximately two tenths of a mile to the worksite. Began work. Used the gas powered brush cutter to cut back the smaller brush encroaching on the trail. Used loppers, pole saw and hand saws to cut back larger brush and overhanging limbs. Cleaned our 21 drains. Total volunteer hours: 10 Volunteers x 6 hours = 60 hours Feet of trail maintained: 2,100