Event#: | 541 |
Date: | 2018-01-27 |
Agency: | State Parks |
Trail: | BBT Trail Saddle Peak Connector |
Leader: | Jerry Mitcham |
Hours: | 60 |
Volunteers: | 10 |
Distance: | 2100 |
Status: | Completed |
Regulars: | 7 |
Casuals: | 3 |
pdf: | 20180127StuntConnector.pdf |
CSUCI: | 0 |
Tag: | BBT |
Previous Events
ID |
Date |
Leader |
Hours |
541 | 2018-01-27 | Jerry Mitcham | 60.0 |
Crew Member |
Hours |
Barb Thomas | 6.00 |
Bill Dinino | 6.00 |
Dave Edwards | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Jerry Mitcham | 6.00 |
Norm Simmonds | 6.00 |
This was a scheduled trail maintenance project. The objective was routine trail maintenance on the section of the BBT from the Stunt Road Connector uphill toward Saddle Peak. The trail had been previously surveyed. There were 10 volunteers present (nine adults and one minor (who worked very hard)). Hiked approximately two tenths of a mile to the worksite. Began work. Used the gas powered brush cutter to cut back the smaller brush encroaching on the trail. Used loppers, pole saw and hand saws to cut back larger brush and overhanging limbs. Cleaned our 21 drains. Total volunteer hours: 10 Volunteers x 6 hours = 60 hours Feet of trail maintained: 2,100