Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:545
Date: 2018-02-10
Agency:State Parks
Trail: BBT, Hondo Canyon Trail (lower)
Leader:Jerry Mitcham
Hours: 132
Volunteers:22
Distance:5000
Status: Completed
Regulars: 8
Casuals: 14
pdf:20180210HondoCynTrail.pdf
CSUCI: 0
Tag:TSP, BBT
Previous Events
ID Date Leader Hours
5452018-02-10Jerry Mitcham132.0
Crew Member Hours
Barb Thomas6.00
Bill Dinino6.00
Dave Edwards6.00
Don Brusselars6.00
George Sherman6.00
Jerry Mitcham6.00
John Kross6.00
Norm Simmonds6.00
This was a scheduled trail maintenance project. The objective was routine trail maintenance on the lower section of the Hondo Canyon section of the BBT. The trail had been previously surveyed. There were a total of 22 volunteers (including one minor) including 11 volunteers from the UCS Outfitters Club. Met at the dirt pull out on Old Topanga Canyon Road. Conducted safety and tool talks. Began work at the trail head. Began work. Used loppers, pole saw and hand saws to cut back larger brush and overhanging limbs. The level of work required varied light to moderate brushing in some areas none at all in others. Cleaned out 16 drains. Total volunteer hours: 22 Volunteers x 6 hours = 132 hours Feet of trail maintained: 5,000