Event#: | 545 |
Date: | 2018-02-10 |
Agency: | State Parks |
Trail: | BBT, Hondo Canyon Trail (lower) |
Leader: | Jerry Mitcham |
Hours: | 132 |
Volunteers: | 22 |
Distance: | 5000 |
Status: | Completed |
Regulars: | 8 |
Casuals: | 14 |
pdf: | 20180210HondoCynTrail.pdf |
CSUCI: | 0 |
Tag: | TSP, BBT |
Previous Events
ID |
Date |
Leader |
Hours |
545 | 2018-02-10 | Jerry Mitcham | 132.0 |
Crew Member |
Hours |
Barb Thomas | 6.00 |
Bill Dinino | 6.00 |
Dave Edwards | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Norm Simmonds | 6.00 |
This was a scheduled trail maintenance project. The objective was routine trail maintenance on the lower section of the Hondo Canyon section of the BBT. The trail had been previously surveyed. There were a total of 22 volunteers (including one minor) including 11 volunteers from the UCS Outfitters Club. Met at the dirt pull out on Old Topanga Canyon Road. Conducted safety and tool talks. Began work at the trail head. Began work. Used loppers, pole saw and hand saws to cut back larger brush and overhanging limbs. The level of work required varied light to moderate brushing in some areas none at all in others. Cleaned out 16 drains. Total volunteer hours: 22 Volunteers x 6 hours = 132 hours Feet of trail maintained: 5,000