Event#: | 549 |
Date: | 2018-03-07 |
Agency: | NPS |
Trail: | Saddle Peak Trail, NPS |
Leader: | Jerry Mitcham |
Hours: | 42 |
Volunteers: | 7 |
Distance: | 1600 |
Status: | Completed |
Regulars: | 6 |
Casuals: | 1 |
pdf: | 20180307SaddleCreekBBT.pdf |
CSUCI: | 0 |
Tag: | BBT |
Previous Events
ID |
Date |
Leader |
Hours |
549 | 2018-03-07 | Jerry Mitcham | 42.0 |
Crew Member |
Hours |
Anne Russell | 6.00 |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Mark Simril | 6.00 |
This was a rain make-up day for the event canceled March 3rd. The objective was routine trail maintenance on the section of the BBT from the Stunt Road Connector uphill toward Saddle Peak. We worked on this section of trail a month ago; today we continued from where we left off on the last trip. There were 7 volunteers. Met at the dirt pull out on Stunt Road near the connector trail head. Conducted safety and tool talks. Hiked approximately six tenths of a mile to the worksite. Began work. Used the gas powered brush cutter to cut back the smaller brush encroaching on the trail. Used loppers, pole saw and hand saws to cut back larger brush and overhanging limbs. Cleaned our 16 drains. Completed work. Hiked back to the meeting place... Completed the days project. Total volunteer hours: 7 Volunteers x 6 hours = 42 hours Feet of trail maintained: 1,600