Event#: | 581 |
Date: | 2018-06-16 |
Agency: | COSCA |
Trail: | Westlake Village YMCA Trails |
Leader: | John Kross |
Hours: | 48 |
Volunteers: | 8 |
Distance: | 1960 |
Status: | Completed |
Regulars: | 7 |
Casuals: | 1 |
pdf: | 20180616WLV_YMCA.pdf |
CSUCI: | 0 |
Tag: | |
Previous Events
ID |
Date |
Leader |
Hours |
581 | 2018-06-16 | John Kross | 48.0 |
Crew Member |
Hours |
Anne Russell | 5.00 |
Barry Dydyk | 5.00 |
Dave Edwards | 5.00 |
Don Brusselars | 5.00 |
George Sherman | 5.00 |
Jerry Mitcham | 5.00 |
Norm Simmonds | 5.00 |
Though official start up time was 8 a.m., as soon as people arrived they were assigned to a crew and crews got going as soon as they had sufficient people. So by 7: 30 we had two crews already on their way. We continued building the trail where we had left off on May 26. The hillside is steep in most areas, so cutting the bench meant removing a lot of dirt. We had 4 crews headed by TC crew leaders, each with 10 to 15 people. John Kross and two of the rangers jumped ahead of everyone to a section that required a bit more attention. Also, Dave Edward worked on an washout that needed special attention and he armored the outside edge of the trail with rocks. In total we had 58 volunteers, 5 rangers, and 6 TC crew members We were treated to a catered lunch of tri-tip, pulled pork BBQ and chicken BBQ with beans, mac & cheese, salads, etc. Total feet of trail built: 1, 960 – Hours per TC crew member: 4.75 Total hours SMMTC: 6 x 4.75 = 28.5