Event#:581
Date: 2018-06-16
Agency:COSCA
Trail: Westlake Village YMCA Trails
Leader:John Kross
Hours: 48
Volunteers:8
Distance:1960
Status: Completed
Regulars: 7
Casuals: 1
pdf:20180616WLV_YMCA.pdf
CSUCI: 0
Tag:
Previous Events
ID Date Leader Hours
5812018-06-16John Kross48.0
Crew Member Hours
Anne Russell5.00
Barry Dydyk5.00
Dave Edwards5.00
Don Brusselars5.00
George Sherman5.00
Jerry Mitcham5.00
Norm Simmonds5.00
Though official start up time was 8 a.m., as soon as people arrived they were assigned to a crew and crews got going as soon as they had sufficient people. So by 7: 30 we had two crews already on their way. We continued building the trail where we had left off on May 26. The hillside is steep in most areas, so cutting the bench meant removing a lot of dirt. We had 4 crews headed by TC crew leaders, each with 10 to 15 people. John Kross and two of the rangers jumped ahead of everyone to a section that required a bit more attention. Also, Dave Edward worked on an washout that needed special attention and he armored the outside edge of the trail with rocks. In total we had 58 volunteers, 5 rangers, and 6 TC crew members We were treated to a catered lunch of tri-tip, pulled pork BBQ and chicken BBQ with beans, mac & cheese, salads, etc. Total feet of trail built: 1, 960 – Hours per TC crew member: 4.75 Total hours SMMTC: 6 x 4.75 = 28.5