Event#:587
Date: 2018-09-08
Agency:NPS
Trail: BBT, Upper Zuma Canyon, NPS
Leader:Barry Dydyk
Hours: 20
Volunteers:5
Distance:800
Status: Completed
Regulars: 5
Casuals: 0
pdf:20180908UpperZuma.pdf
CSUCI: 0
Tag:BBT
Previous Events
ID Date Leader Hours
5872018-09-08Barry Dydyk20.0
Crew Member Hours
Barry Dydyk4.00
Dave Perlmutter4.00
Don Brusselars4.00
George Sherman4.00
Jerry Mitcham4.00
Started work at the entrance from the pull out on Kanan Road juts north of the trail head parking. We did some dried mustard removal for about 100 feet. Ran into an area where the trail tread was being pushed to the downhill side of the trail. Noted that the large amount of slough and trees overgrowing the trail were forcing hikers and bikers to the outside edge. Removed about 3 feet of slough from uphill side of trail and then cut back overgrown trees. We effectively moved the trail 3 feet to the uphill side for about 400 feet of trail. This same scenario needs to be repeated for several additional areas down the trail. Due to the excessive heat (100 degrees) we terminated our efforts at 12: 30