Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:613
Date: 2018-12-19
Agency:NPS
Trail: Sandstone Peak Trail
Leader:Jerry Mitcham
Hours: 30
Volunteers:5
Distance:1050
Status: Completed
Regulars: 4
Casuals: 1
pdf:20181219SandstonePeak.pdf
CSUCI: 0
Tag:CIRCLE X, Woolsey_Fire
Previous Events
ID Date Leader Hours
6162019-01-10Jerry Mitcham24.0
6152019-01-05Jerry Mitcham96.0
6142018-12-29Jerry Mitcham60.0
6112018-12-22Dave Edwards48.0
6132018-12-19Jerry Mitcham30.0
3542015-10-03Dave Edwards66.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Dave Perlmutter6.00
Jerry Mitcham6.00
This was a scheduled trail maintenance project. This section of the Backbone Trail was heavily impacted by the Woolsey fire a few weeks ago. The objective of today’s project was to assist NPS with remediation efforts on this section of the trail. There were 5 volunteers and two NPS staff present. Met at the Sandstone Peak parking lot. Began work. Hiked up the trail to the stairs which lead up to the peak (1.5 mi). On the way, the NPS leader flagged many drains to be cleaned or installed. The stairs were heavily damaged by the fire. We remove the mains of the timbers and hardware and moved them a safe distance away. Under the direction of the NPS leader, we cut in a small new, temporary trail which circumvents the area of the stairs and provides a safe access to the peak. After lunch, we began the hike back toward the parking lot. Beginning at the top of the trail, we began to clean out or install the flagged drains. We managed to service several drains on the way down. Arrived at the parking lot. Completed project. This trail is in terrible condition. The tread has been neglected for several years and there is much erosion in need off attention. There are many more drains to be serviced – this is the first of several trips require just to try to improve the drainage. While our work is significant, at best, it only slows the derogation of the trail. The trail needs major attention to restore it to NPS trail standards. Total volunteer hours: 5 Volunteers x 6 hours = 30 hours Feet of trail serviced: 1,050