Event#:616
Date: 2019-01-10
Agency:NPS
Trail: Sandstone Peak Trail
Leader:Jerry Mitcham
Hours: 24
Volunteers:4
Distance:7500
Status: Completed
Regulars: 4
Casuals: 0
pdf:20190110SandstonePeak.pdf
CSUCI: 0
Tag:CIRCLE X, Woolsey_Fire
Previous Events
ID Date Leader Hours
6162019-01-10Jerry Mitcham24.0
6152019-01-05Jerry Mitcham96.0
6142018-12-29Jerry Mitcham60.0
6112018-12-22Dave Edwards48.0
6132018-12-19Jerry Mitcham30.0
3542015-10-03Dave Edwards66.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Jerry Mitcham6.00
John Kross6.00
This was an unscheduled trail damage assessment project. The SMMTC trail crew has conducted four work days on this section of the BBT during the last month. This work included the repair and installation of 61 drainage features. This assessment was to survey the work done over the last few weeks to see how these features performed during the recent rain. There were 4 volunteers present. Met at the Sandstone Peak parking lot. We hiked up the trail to the steps leading to Sandstone Peak. We found that some (illegal) hikers had removed the materials that had been installed to keep users off of the damaged steps. The trail realignment we had installed was not being used. We reinstalled the materials to block the steps and made the new trail more obvious. We then hiked back sown the trail inspecting the drainage features to determine their effectiveness. We did minor repair to one drain. All other drainage features are working as intended. Completed the hike at the parking lot. Project complete. Total volunteer hours: 4 Volunteers x 6 hours = 24 hours Feet of trail serviced: 7, 400