Event#: | 616 |
Date: | 2019-01-10 |
Agency: | NPS |
Trail: | Sandstone Peak Trail |
Leader: | Jerry Mitcham |
Hours: | 24 |
Volunteers: | 4 |
Distance: | 7500 |
Status: | Completed |
Regulars: | 4 |
Casuals: | 0 |
pdf: | 20190110SandstonePeak.pdf |
CSUCI: | 0 |
Tag: | CIRCLE X, Woolsey_Fire |
Previous Events
ID |
Date |
Leader |
Hours |
616 | 2019-01-10 | Jerry Mitcham | 24.0 |
615 | 2019-01-05 | Jerry Mitcham | 96.0 |
614 | 2018-12-29 | Jerry Mitcham | 60.0 |
611 | 2018-12-22 | Dave Edwards | 48.0 |
613 | 2018-12-19 | Jerry Mitcham | 30.0 |
354 | 2015-10-03 | Dave Edwards | 66.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
This was an unscheduled trail damage assessment project. The SMMTC trail crew has conducted four work days on this section of the BBT during the last month. This work included the repair and installation of 61 drainage features. This assessment was to survey the work done over the last few weeks to see how these features performed during the recent rain. There were 4 volunteers present. Met at the Sandstone Peak parking lot. We hiked up the trail to the steps leading to Sandstone Peak. We found that some (illegal) hikers had removed the materials that had been installed to keep users off of the damaged steps. The trail realignment we had installed was not being used. We reinstalled the materials to block the steps and made the new trail more obvious. We then hiked back sown the trail inspecting the drainage features to determine their effectiveness. We did minor repair to one drain. All other drainage features are working as intended. Completed the hike at the parking lot. Project complete. Total volunteer hours: 4 Volunteers x 6 hours = 24 hours Feet of trail serviced: 7, 400