Event#:621
Date: 2019-02-20
Agency:NPS
Trail: Upper Zuma - BBT
Leader:Dave Edwards
Hours: 25
Volunteers:5
Distance:1000
Status: Completed
Regulars: 5
Casuals: 0
pdf:20190220UpperZuma.pdf
CSUCI: 0
Tag:BBT, Woolsey_Fire
Previous Events
ID Date Leader Hours
6212019-02-20Dave Edwards25.0
5922018-09-26George Sherman8.0
5822018-07-21Jerry Mitcham6.0
Crew Member Hours
Barry Dydyk5.00
Dave Edwards5.00
Dave Perlmutter5.00
Don Brusselars5.00
Norm Simmonds5.00
Work consisted entirely of filling in a large ditch with various sizes of rocks and gravelly dirt. The ditch (created by the recent heavy rains after the Woosley fire) eroded across the trail some 15 ft long, 3 ft deep and 2 ft wide. We built a rock wall on the down side of the ditch up to level with the trail and backfilled with various sizes of rocks and gravel. Once this task was completed we conducted a trail assessment of the BBT heading west from the juncture with the Zuma Ridge Rd. for about one mile thru the old Schwarzenegger section. The trail has no hazardous sections but needs some tread work. Hikers will have no problems hiking this area. Hours worked: 5 Crew size: 5 Total hours: 25