Event#:622
Date: 2019-02-27
Agency:State Parks
Trail: Upper Sycamore Canyon Trail
Leader:Dave Edwards
Hours: 54
Volunteers:9
Distance:100
Status: Completed
Regulars: 8
Casuals: 1
pdf:20190227UpperSycamore.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
7122019-12-27George Sherman6.0
6222019-02-27Dave Edwards54.0
6002018-10-13John Kross3.0
5592018-04-25Norm Simmonds18.0
5272017-11-28Jerry Mitcham30.0
5282017-11-16John Kross42.0
5252017-11-14Barry Dydyk36.0
5212017-11-09Jerry Mitcham48.0
5202017-11-07John Kross30.0
5222017-11-02Dave Edwards24.0
5232017-10-31Barry Dydyk24.0
5182017-10-26Jerry Mitcham30.0
5142017-10-19Dave Edwards4.0
5022017-07-29John Kross16.0
5012017-07-19Jerry Mitcham25.0
5002017-07-06Dave Edwards30.0
4892017-05-17John Kross16.0
4732017-03-25Dave Edwards66.0
4652017-02-23Dave Edwards10.0
4582017-01-18Norm Simmonds60.0
4172016-06-24Dave Edwards20.0
4132016-06-08Norm Simmonds38.5
3902016-03-15Norm Simmonds9.0
3762016-01-16Dave Edwards54.0
3752016-01-09Dave Edwards66.0
3422015-06-27Norm Simmonds48.0
3362015-06-13John Kross36.0
2162014-03-19Norm Simmonds42.0
1582013-07-1613.5
1432013-05-1548.0
1652013-04-21203.0
Crew Member Hours
Anne Russell6.00
Barry Dydyk6.00
Bill Dinino6.00
Dave Edwards6.00
George Sherman6.00
Jerry Mitcham6.00
John Kross6.00
Mark Simril6.00
Upper Sycamore Canyon in Point Mugu State Park. Todays work consisted of building a reroute of the trail which was washed out by the recent rains. It involved building a rock wall about 2 ft high by 20 ft long along the bottom portion of the reroute. This will help prevent erosion when the creek rises from heavy rains in the future. In building the reroute we dug a 20% grade straight into an 8 ft vertical dirt and rocky bluff. This new trail joins up with the existing trail at the top of the bluff and is some 30 ft long from top to bottom. We also repaired a short section of trail at the next creek crossing which was damaged by the high water. Hours worked: 6 Crew size: 9 Total hours: 54