Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:623
Date: 2019-02-23
Agency:State Parks
Trail: Chamberlain Trail
Leader:John Kross
Hours: 296
Volunteers:36
Distance:6652
Status: Completed
Regulars: 11
Casuals: 25
pdf:20190223ChamberlainBBT.pdf
CSUCI: 0
Tag:PMSP, BBT, Woolsey_Fire
Previous Events
ID Date Leader Hours
6232019-02-23John Kross296.0
2252014-04-26Dave Edwards84.0
1902013-12-07Jerry Mitcham134.0
1612013-04-2030.0
392012-03-1166.0
Crew Member Hours
Anne Russell8.00
Barry Dydyk8.00
Bill Dinino8.00
Dave Edwards8.00
Don Brusselars8.00
George Sherman8.00
Greg Sweel8.00
Ingrid Cassady8.00
Jerry Mitcham8.00
John Kross8.00
Mike Epler6.00
This was a trail work day with trail runners. A total of 27 runners participated, as well as 10 Trails Council volunteers SMMTC volunteers meet at the Wendy and Potrero trailhead. SMMTC volunteers reconvene at Danielson Campground SMMTC volunteers meets runners at the junction of Old Boney and Chamberlain trails. Dale Skinner of State Parks drove the tools up to the work site on a Gator. After picking up a tool and a safety talk, runners were organized into groups of 6 to 8 and assigned to TC crew leaders. Crews start up the hill to the work areas. The trail runners put in an excellent effort and performed quality work on the trail. They went all the way up to Chamberlain Rock. Maintenance accomplished consisted of filling in ruts on the trail to restore the bench, clearing slough to re-establish trail width, cutting into the hillside to widen the trail where needed, sawing hazardous branches, and cleaning and putting in new drains. A total of 6 drains were cleaned and 4 new drains were built. We stopped work and hiked back to the Gator to drop off the tools Some runners ran back, SMMTC volunteers and some runners hiked back to Danielson Campground. Two trucks took runners to the entrance gate at the top of the hill and went back to get the SMMTC volunteers, then drove out of the park. SMMTC volunteers were back to their vehicles at the Wendy and Potrero trail head Total Volunteer Hours: 37 people x 8 hours = 296 hours Feet of trail maintained: 6, 652