Event#: | 627 |
Date: | 2019-03-27 |
Agency: | NPS |
Trail: | Backbone Trail, Latigo |
Leader: | Jerry Mitcham |
Hours: | 36 |
Volunteers: | 6 |
Distance: | 3200 |
Status: | Completed |
Regulars: | 4 |
Casuals: | 2 |
pdf: | 20190327LatigoBBT.pdf |
CSUCI: | 0 |
Tag: | BBT |
Previous Events on this Trail
ID |
Date |
Leader |
Hours |
645 | 2019-05-08 | Norm Simmonds | 48.0 |
627 | 2019-03-27 | Jerry Mitcham | 36.0 |
Crew Member |
Hours |
Bill Dinino | 6.00 |
Dave Edwards | 6.00 |
Jerry Mitcham | 6.00 |
Jon Sheldon | 6.00 |
This was a routine trail maintenance project. The objective of this project was to repair damage resulting from the Woolsey Fire and winter rains. There were 6 volunteers present. Removed two downed trees on the trail. Removed the worst of the slough on the trail. Filled some trenches in the tread. Repaired/restored 4 drains. Met up with the NPS crew on the far side of the canyon. Under their direction, we helped to realign a short section of trail.
Total volunteer hours: 6 Volunteers x 6 hours = 36 hours Feet of trail serviced: 3,200