Event#:632
Date: 2019-04-06
Agency:State Parks
Trail: Fireline Trail
Leader:Jerry Mitcham
Hours: 156
Volunteers:26
Distance:1050
Status: Completed
Regulars: 5
Casuals: 21
pdf:20190406FirelineTrail.pdf
CSUCI: 21
Tag:PMSP, CSUCI
Previous Events
ID Date Leader Hours
7282020-03-07Jerry Mitcham127.0
6322019-04-06Jerry Mitcham156.0
6252019-03-09John Kross186.0
3162015-04-18John Kross180.0
3142015-04-11Jerry Mitcham204.0
3052015-03-04Jerry Mitcham48.0
1032012-11-2460.0
42011-09-2848.0
312011-09-0348.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Dave Perlmutter6.00
Greg Sweel6.00
Jerry Mitcham6.00
This was a routine trail maintenance project. It was a joint project with students from CSUCI. The objective of this project was to perform routine trail maintenance on the Fireline Trail. Unfortunately, the scheduled bus to transport the students from CSUCI campus to Point Mugu State Park did not show up. The students agreed to carpool to the work site. Once at the state park. Things went according to plan. There were 21 CSUCI and 5 SMMTC volunteers present. Met at the CSUCI campus. Met at the Sycamore Canyon day use area parking lot. Hiked to the Fireline trail head. Arrived at the trail head. Conducted safety and tool talks. Began the work about .4 miles up the trail (where we finished work at the last work event). One brush trimmer (operated by a SMMTC volunteer) preceded the student volunteers on the trail, cutting the heavier brush and other growth. The other volunteers followed and cleaned up cuttings, removed slough and smoothed the eroded tread. Drainage on the trail is effective so we did not need to clean or install any drains. Completed work and hiked back to the trail head. Completed the students required paperwork and conducted a gift raffle (handed out five gifts). Student volunteers hiked back to the parking lot. Total volunteer hours: 26 Volunteers x 6 hours = 156 hours Feet of trail serviced: 1,050