Event#: | 634 |
Date: | 2019-04-13 |
Agency: | State Parks |
Trail: | Saddle Creek Trail, Malibu Creek SP |
Leader: | Greg Sweel |
Hours: | 38 |
Volunteers: | 6 |
Distance: | 2600 |
Status: | Completed |
Regulars: | 6 |
Casuals: | 0 |
pdf: | 20190413BBT-Piuma.pdf |
CSUCI: | 0 |
Tag: | BBT |
Previous Events
ID |
Date |
Leader |
Hours |
707 | 2019-11-23 | Greg Sweel | 192.0 |
634 | 2019-04-13 | Greg Sweel | 38.5 |
630 | 2019-03-30 | George Sherman | 72.0 |
464 | 2017-02-11 | Dave Edwards | 48.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Bill Dinino | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 8.50 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
Arrive at pull-out on Piuma Road. We worked the BBT segment going towards Saddle Peak. Two regular volunteers take two (2) weed whackers with gear and fuel. Walk to trailhead and begin removal of vegetation. Other volunteers remove slough, debris, cuttings, and improve tread. Reach Dark Canyon creek crossing after removing branches and cutting back poison oak. Proceed up the trail past the creek. Remove fallen trees. Weed Whip brush and grasses along edge of trail. Improve tread and remove slough. Resume work. General tread maintenance and slough removal. Continue weed whipping up the switchbacks. Improve and widen tread. 6 volunteers x 6 hours = 36 hours (see sign-in sheet) Total distance maintained = 2600 feet. Please add 2.5 hours for Greg Sweel's trail assessment performed the prior week.