Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:641
Date: 2019-04-27
Agency:State Parks
Trail: Trail Days Saturday
Leader:Jerry Mitcham
Hours: 678
Volunteers:111
Distance:17195
Status: Completed
Regulars: 11
Casuals: 100
pdf:20190427TrailDays.pdf
CSUCI: 0
Tag:PMSP, BBT
Previous Events
ID Date Leader Hours
6412019-04-27Jerry Mitcham678.0
4052016-04-23Jerry Mitcham90.0
3242015-04-25Jerry Mitcham84.0
Crew Member Hours
Anne Russell6.00
Barb Thomas16.00
Barry Dydyk6.00
Bill Dinino6.00
Dave Edwards6.00
Dave Perlmutter6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
Jerry Mitcham6.00
John Kross6.00
Volunteers began to arrive and sign in Twelve SMMTC volunteers were on hand to organize and supervise the trail maintenance activities. Volunteers were organized into several crews. Crews were shuttled to various trail heads, assigned crew leaders and issued tools. The crewleaders conducted tool talk and safety briefings to their respective crews. Seven crews hiked to their assigned work sites, up the Blue Canyon/Old Boney trails. The Sierra Club volunteers were shuttled their work sites on the Wood Canyon Vista Trail. The CORBA crew was shuttled to the Two Foxes Trail The trails, crews and work accomplishments were as follows: Crew Under 10 Years-of- age (and parents): Blue Canyon Trail. Fourteen volunteers performed lopping and weed removal on 1,640 feet of trail. Crew Leader: Barb Thomas Total volunteer hours: (14 volunteers x 6 hours) = 84 hours Feet of trail maintained: 1,640 Crew #1: Blue Canyon Trail; 11 volunteers. Crew #1 Lopped brush from a badly overgrown trail. Since much of the trail had been washed away in the winter rains, the trail alignment was delineated and widened. Crew leader(s): Jon Van Gorder/Don Brusselars Total volunteer hours: (11 volunteers x 6 hours) = 66 hours Feet of trail maintained: 1,300 Crew #2: Blue Canyon Trail. 11 volunteers. Crew #2 Chopped heavy weeds and growth along trail, widening the tread. Repaired two badly silted drains. Removed rocks and other debris from the entire section of trail... Crew leader: Anne Russell Total volunteer hours: (11 volunteers x 6 hours) = 66 hours Feet of trail maintained: 1,270 Crew #3: Old Boney Trail; 13 volunteers. Crew #3 Chopped heavy weeds and growth along trail, widening the tread. Three new drains were installed, through a large berm. Filled 150 feet of trench in the trail. Outsloped and cleared 60 feet of trail. Crew leader: George Sherman/Chris Morneau Total volunteer hours: (13 volunteers x 6 hours) = 78 hours Feet of trail maintained: 1,110 Crew #4: Old Boney Trail; 14 volunteers. Cr