Date: 2019-04-28
Agency:State Parks
Trail: Trail Days Sunday
Leader:Jerry Mitcham
Hours: 249
Volunteers:78
Distance:2413
Status: Completed
Regulars: 10
Casuals: 68
pdf:20190428TrailDays.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
6422019-04-28Jerry Mitcham249.0
4062016-04-24Jerry Mitcham27.0
3252015-04-26Jerry Mitcham72.0
Crew Member Hours
Anne Russell3.00
Barb Thomas9.00
Barry Dydyk6.00
Bill Dinino3.00
Dave Edwards6.00
Dave Perlmutter3.00
Greg Sweel3.00
Jerry Mitcham6.00
John Kross6.00
John Reyes3.00
Volunteers began to arrive and sign in. Ten SMMTC volunteers were on hand to organize and supervise the trail maintenance activities. Crew leaders and volunteers were shuttled to the trail head. Volunteers were organized into two crews, assigned crew leaders and issued tools. The crewleaders conducted tool talk and safety briefings to their respective crews. The trails, crews and work accomplishments were as follows Crew #1: Upper Sycamore Canyon Trail. 49 volunteers. Crew #1 used power tools to cut weeds and lighter brush. Loppers were used to remove heavier brush, to reestablish the four foot width. A short section near the upper end of the trail were slightly realigned and cleaned. Near the mid-section of the trail, slough was removed and tread outsloped. Crew leader: Dave Edwards/Barry Dydyk Total volunteer hours: (49 volunteers x 3 hours) = 147 hours Feet of trail maintained: 716 Crew #2: Blue Canyon Trail. 18 Volunteers (under 10 years of age and parents). Crew #2 Lopped and chopped light brush alongside the trail to reestablish the four foot width. Crew leader: Barb Thomas/Anne Russell Volunteer hours (18 volunteers x 3 hours) = 54 hours Feet of trail maintained: 200 CORBA: Two Foxes Trail: 6 Volunteers. The CORBA crew brushed and chopped weeds on the Two Foxes Trail.. Crew leader: Steve Clark Total volunteer Hours: (6 volunteers x 3 hours) = 18 hours Feet of trail maintained: 2,213 Campground Breakdown: 4 Volunteers. After trail work and lunch, 4 volunteers stayed behind to clean up the campground, pack up equipment and return equipment to the Storage Unit. Total volunteers (4 volunteers x 3 hours)= 12 hours Total volunteer hours for Sunday: 219 hours Feet of trail maintained: 2,413