Event#: | 642 |
Date: | 2019-04-28 |
Agency: | State Parks |
Trail: | Trail Days Sunday |
Leader: | Jerry Mitcham |
Hours: | 249 |
Volunteers: | 78 |
Distance: | 2413 |
Status: | Completed |
Regulars: | 10 |
Casuals: | 68 |
pdf: | 20190428TrailDays.pdf |
CSUCI: | 0 |
Tag: | PMSP |
Previous Events
ID |
Date |
Leader |
Hours |
642 | 2019-04-28 | Jerry Mitcham | 249.0 |
406 | 2016-04-24 | Jerry Mitcham | 27.0 |
325 | 2015-04-26 | Jerry Mitcham | 72.0 |
Crew Member |
Hours |
Anne Russell | 3.00 |
Barb Thomas | 9.00 |
Barry Dydyk | 6.00 |
Bill Dinino | 3.00 |
Dave Edwards | 6.00 |
Dave Perlmutter | 3.00 |
Greg Sweel | 3.00 |
Jerry Mitcham | 6.00 |
John Kross | 6.00 |
John Reyes | 3.00 |
Volunteers began to arrive and sign in. Ten SMMTC volunteers were on hand to organize and supervise the trail maintenance activities.
Crew leaders and volunteers were shuttled to the trail head. Volunteers were organized into two crews, assigned crew leaders and issued tools. The crewleaders conducted tool talk and safety briefings to their respective crews. The trails, crews and work accomplishments were as follows
Crew #1: Upper Sycamore Canyon Trail. 49 volunteers. Crew #1 used power tools to cut weeds and lighter brush. Loppers were used to remove heavier brush, to reestablish the four foot width. A short section near the upper end of the trail were slightly realigned and cleaned. Near the mid-section of the trail, slough was removed and tread outsloped.
Crew leader: Dave Edwards/Barry Dydyk
Total volunteer hours: (49 volunteers x 3 hours) = 147 hours
Feet of trail maintained: 716
Crew #2: Blue Canyon Trail. 18 Volunteers (under 10 years of age and parents). Crew #2 Lopped and chopped light brush alongside the trail to reestablish the four foot width.
Crew leader: Barb Thomas/Anne Russell
Volunteer hours (18 volunteers x 3 hours) = 54 hours
Feet of trail maintained: 200
CORBA: Two Foxes Trail: 6 Volunteers. The CORBA crew brushed and chopped weeds on the Two Foxes Trail..
Crew leader: Steve Clark
Total volunteer Hours: (6 volunteers x 3 hours) = 18 hours
Feet of trail maintained: 2,213
Campground Breakdown: 4 Volunteers. After trail work and lunch, 4 volunteers stayed behind to clean up the campground, pack up equipment and return equipment to the Storage Unit.
Total volunteers (4 volunteers x 3 hours)= 12 hours
Total volunteer hours for Sunday: 219 hours
Feet of trail maintained: 2,413