Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:669
Date: 2019-07-23
Agency:State Parks
Trail: Kiosk Replacement @ Corral Canyon
Leader:Jerry Mitcham
Hours: 7
Volunteers:2
Distance:100
Status: Completed
Regulars: 2
Casuals: 0
pdf:20190723BBTImprovements.pdf
CSUCI: 0
Tag:MCSP, BBT, Woolsey_Fire
Previous Events
ID Date Leader Hours
6692019-07-23Jerry Mitcham7.0
Crew Member Hours
Barry Dydyk3.50
Jerry Mitcham3.50
This was a special project to replace a display kiosk, at the Corral Canyon BBT Trailhead, which was destroyed in the Woolsey Fire. The replacement kiosk was paid for by SMMTC and was installed today by two SMMTC volunteers. Met at the trailhead at the Thousand Oaks Transportation Center. Drove to Malibu Creek State Park. Loaded the new kiosk into truck. Drove to the trailhead. Arrived at the Coral Canyon BBT Trailhead. Completed assembly of the kiosk, attached the Backbone Trail sign and attached the upper part of the kiosk to the previously installed legs. (The lower legs of the kiosk survived the fire, so we only had to attach the upper part.). Installed a trail map to the new kiosk. Completed the installation. Drove back to the meeting place. Arrived back at meeting place. Total volunteer hours: 2 Volunteers x 3.5 hours = 7 hours Feet of trail maintained: None