Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:702
Date: 2019-11-02
Agency:NPS
Trail: Backbone Trail, Upper Zuma Canyon, NPS
Leader:Greg Sweel
Hours: 74
Volunteers:12
Distance:2100
Status: Completed
Regulars: 8
Casuals: 4
pdf:20191102UpperZuma.pdf
CSUCI: 0
Tag:BBT
Previous Events
ID Date Leader Hours
7022019-11-02Greg Sweel74.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Greg Sweel8.00
Jerry Mitcham6.00
John Kross6.00
Jon Sheldon6.00
Norm Simmonds6.00
Sharon Simmonds6.00
Arrive at pull-out approximately ΒΌ mile north of Tunnel #1 on Kanan Road. Pass the sign-in sheet, distribute tools and discuss logistics. Hiked down to creek crossing with some lopping, drain repair/installation and removal of loose rocks along the way. West of the creek, we installed and repaired several drains and water diversions. A buried culvert was located, excavated, and restored to functionality. Additional drains were cleaned and ruts were filled in. Take lunch break. Resume work improving tread, widening trail, filling in ruts. Stop work and hiked back to the parking lot. Return tools. End of work day. 12 volunteers x 6 hours = 72 hours (see sign-in sheet) 1 volunteer (Crew Leader) + 2 hours for surveying trail on 10/19/19 and phone discussions with Mike Zenan (NPS). Total distance maintained = 2100 feet.