Event#: | 709 |
Date: | 2019-12-14 |
Agency: | State Parks |
Trail: | Backbone Trail, Rogers Road |
Leader: | Greg Sweel |
Hours: | 114 |
Volunteers: | 19 |
Distance: | 2200 |
Status: | Completed |
Regulars: | 7 |
Casuals: | 12 |
pdf: | 20191214BBTRogersRoad.pdf |
CSUCI: | 0 |
Tag: | TSP, BBT |
Previous Events
ID |
Date |
Leader |
Hours |
709 | 2019-12-14 | Greg Sweel | 114.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Don Brusselars | 6.00 |
George Sherman | 6.00 |
Greg Sweel | 6.00 |
Jerry Mitcham | 6.00 |
Jon Sheldon | 6.00 |
This was a joint work project with the Concerned Off-Road Bicyclists Association (CORBA), Girls Gone Riding (GGR), and Recreational Equipment, Inc. (REI). Arrive at Will Rogers State Historic Park (WRSHP) and assist with parking. Pass the sign-in sheet and shuttle to the trailhead. Distribute tools, discuss logistics, and provide tool safety talk. A crew of nine (9) proceeded up to the Lone Oak carrying two (2) hedge trimmers and a weed whip. They cleared brush along the trail. The remainder of the group performed brushing, tread repair, and removal of loose rocks along the way. Take lunch break. Resume work improving tread, widening trail, and brushing. Stop work and hiked back to vehicles at WRSHP. Return tools. End of work day.
19 volunteers x 6 hours = 114 hours (see sign-in sheet).
Total distance maintained = 2250 feet.
[Note: More brushing is needed on this section of the BBT and we will need to return to clear/widen it all).