Event#:722
Date: 2020-02-15
Agency:NPS
Trail: Malibu Springs Trail
Leader:George Sherman
Hours: 66
Volunteers:11
Distance:3000
Status: Completed
Regulars: 10
Casuals: 1
pdf:20200215MalibuSprings.pdf
CSUCI: 0
Tag:CIRCLE X
Previous Events
ID Date Leader Hours
7262020-02-22John Kross78.0
7232020-02-16George Sherman5.0
7222020-02-15George Sherman66.0
6532019-06-08George Sherman66.0
5532018-04-07John Kross150.0
822012-10-0630.0
812012-09-2972.0
Crew Member Hours
Barb Thomas6.00
Dave Edwards6.00
Dave Perlmutter6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
John Kross6.00
Jon Sheldon6.00
Norm Simmonds6.00
Sharon Simmonds6.00
A group of ten volunteers assembled at Leo Carrillo State Park to shuttle to the worksite. John Kross arrived separately. Our objective for the day was to clear the Malibu Springs Trail. From the trailhead, we were confronted with an overgrown and badly eroded trail. Three gas-powered brush trimmers were utilized to trim back vegetation. Several volunteers followed behind and removed the cuttings. Several drains we re-created. On occasion, rocks were placed in the ruts running down the trail to mitigate further erosion of water damage. We managed to clear about 3000 feet of trail. On the bright side, the vegetation is recovering nicely from the Woolsey Fire. John Kross scouted the trail on the previous Sunday. 11 volunteers @ 6 hours 11 volunteers and 66 hours