Event#:728
Date: 2020-03-07
Agency:State Parks
Trail: Fireline Trail
Leader:Jerry Mitcham
Hours: 127
Volunteers:21
Distance:3150
Status: Completed
Regulars: 11
Casuals: 0
pdf:20200307FirelineTrail.pdf
CSUCI: 10
Tag:PMSP, CSUCI
Previous Events
ID Date Leader Hours
7522020-06-13Greg Sweel60.0
7512020-06-06Greg Sweel66.0
7282020-03-07Jerry Mitcham127.0
6322019-04-06Jerry Mitcham156.0
6252019-03-09John Kross186.0
3162015-04-18John Kross180.0
3142015-04-11Jerry Mitcham204.0
3052015-03-04Jerry Mitcham48.0
1032012-11-2460.0
42011-09-2848.0
312011-09-0348.0
Crew Member Hours
Barb Thomas6.00
Barry Dydyk6.00
Dave Edwards6.00
Don Brusselars6.00
George Sherman6.00
Greg Borgeson6.00
Greg Sweel6.00
Jerry Mitcham7.00
John Kross6.00
Norm Simmonds6.00
Sharon Simmonds6.00
This was a scheduled trail maintenance event. It was a joint project with student volunteers from CSUCI. The objective of the project was to conduct light brushing on the Fireline trail. There were eleven SMMTC volunteers and ten CSUCI volunteers present. Trails Council provided a bus to transport the student from the CSUCI campus to the Pt. Mugu meeting place. One volunteer met the bus and the CSUCI volunteers at the CSUCI campus. SMMTC volunteers met at the Sycamore Campground parking lot. They carpooled into the park, to the Fireline trailhead. Began work with the power tools. Bus with the CSUCI volunteers arrived at the parking lot. Volunteers hiked into the park to the Fireline trailhead. Conducted tool talk and safety briefing with the CSUCI volunteers. Hiked up the trail to the worksite, Began work. Work consisted of clearing brush cutting from the trail and removing slough from the inside of the trail. Competed work. Returned to the trailhead. CSUCI volunteers hiked back to the parking lot. CSUCI volunteers met the bus at the parking lot and were transported back to the campus. Completed the day’s project. Total volunteer hours: 21 Volunteers x 6 hours = 126 hours Feet of trail maintained: 3,150