Event#:736
Date: 2020-04-28
Agency:NPS
Trail: Mishe Mokwa Trail
Leader:Don Brusselars
Hours: 8
Volunteers:2
Distance:200
Status: Completed
Regulars: 2
Casuals: 0
pdf:20200428MisheMokwaTrail.pdf
CSUCI: 0
Tag:BBT,CIRCLE X,Covid-19
Previous Events
ID Date Leader Hours
7482020-05-23Dave Edwards30.0
7472020-05-21Barry Dydyk8.0
7452020-05-16Dave Edwards36.0
7442020-05-14Jerry Mitcham8.0
7422020-05-13Norm Simmonds24.0
7432020-05-12Jerry Mitcham9.0
7412020-05-11Dave Edwards24.0
7402020-05-08Dave Edwards18.0
7392020-05-06Jerry Mitcham12.0
7372020-05-04Jerry Mitcham13.5
7382020-05-04Dave Edwards13.5
7352020-04-30Jerry Mitcham12.0
7362020-04-28Don Brusselars8.0
7322020-04-28Barry Dydyk12.0
7302020-04-22Jerry Mitcham12.0
7312020-04-21Barry Dydyk13.5
6032018-11-03Jerry Mitcham54.0
5982018-10-06Dave Edwards72.0
5512018-03-17George Sherman42.0
5432018-02-03John Kross54.0
5172017-10-28Barry Dydyk48.0
3842016-01-30Greg Sweel54.5
Crew Member Hours
Dave Perlmutter4.00
Don Brusselars4.00
This was one of the specially scheduled COVID-19 trail maintenance projects. Since the park is closed on the week ends, we are only working on weekdays, with very small crews and practicing “social distancing. We had 2 volunteers for the project. Met at the trailhead on Yerba Buena Road. Performed the GAR evaluation and conducted safety and tool talks. Hiked up the trail to a location where the last crew stopped work earlier in the week. Began work. Cleaned all drains and cleared brush encroaching on the trail. We ignored the grass growing along the edges as this will die out soon. Stopped work and began hike down to the trailhead. . Arrived back at the trailhead. Project complete. Total volunteer hours: 2 Volunteers x 4 hours = 8 hours Feet of trail maintained: 200 ft.