Event#: | 741 |
Date: | 2020-05-11 |
Agency: | NPS |
Trail: | Mishe Mokwa Trail |
Leader: | Dave Edwards |
Hours: | 24 |
Volunteers: | 4 |
Distance: | 60 |
Status: | Completed |
Regulars: | 4 |
Casuals: | 0 |
pdf: | 20200511MisheMokwa.pdf |
CSUCI: | 0 |
Tag: | BBT,CIRCLE X,Covid-19 |
Previous Events on this Trail
ID |
Date |
Leader |
Hours |
748 | 2020-05-23 | Dave Edwards | 30.0 |
747 | 2020-05-21 | Barry Dydyk | 8.0 |
745 | 2020-05-16 | Dave Edwards | 36.0 |
744 | 2020-05-14 | Jerry Mitcham | 8.0 |
742 | 2020-05-13 | Norm Simmonds | 24.0 |
743 | 2020-05-12 | Jerry Mitcham | 9.0 |
741 | 2020-05-11 | Dave Edwards | 24.0 |
740 | 2020-05-08 | Dave Edwards | 18.0 |
739 | 2020-05-06 | Jerry Mitcham | 12.0 |
738 | 2020-05-04 | Dave Edwards | 13.5 |
737 | 2020-05-04 | Jerry Mitcham | 13.5 |
735 | 2020-04-30 | Jerry Mitcham | 12.0 |
736 | 2020-04-28 | Don Brusselars | 8.0 |
732 | 2020-04-28 | Barry Dydyk | 12.0 |
730 | 2020-04-22 | Jerry Mitcham | 12.0 |
731 | 2020-04-21 | Barry Dydyk | 13.5 |
603 | 2018-11-03 | Jerry Mitcham | 54.0 |
598 | 2018-10-06 | Dave Edwards | 72.0 |
551 | 2018-03-17 | George Sherman | 42.0 |
543 | 2018-02-03 | John Kross | 54.0 |
517 | 2017-10-28 | Barry Dydyk | 48.0 |
384 | 2016-01-30 | Greg Sweel | 54.5 |
74 | 2012-09-01 | | 66.0 |
61 | 2012-06-16 | | 36.0 |
Crew Member |
Hours |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
John Kross | 6.00 |
Jon Sheldon | 6.00 |
Summary: We hiked to the work site at 7:30 and split into two groups. One group finished the work on the Sandstone Peak connector trail. The trail starting from the Sandstone Peak side has now been moved over and out of the badly eroded old trail up to where it levels off. We also installed a step three rocks wide near the Mishe Mokwa trail.
Most of the work effort was on the Mishe Mokwa trail where we installed a water drain and removed the berm on about a 30 ft section of very rocky and eroded trail. This entailed removing several large rocks lining the outside of the trail. Lots of vegetation and several small tree stumps were removed. The finished section is now smooth with a gentle out slope. We arrived back at trailhead parking at 1:30
Crew size: 4
Hours worked: 6
Total hours: 24
Total feet of trail worked: 60 ft