Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:743
Date: 2020-05-12
Agency:NPS
Trail: Mishe Mokwa Trail
Leader:Jerry Mitcham
Hours: 9
Volunteers:3
Distance:60
Status: Completed
Regulars: 3
Casuals: 0
pdf:20200512MisheMokwa.pdf
CSUCI: 0
Tag:BBT,CIRCLE X,Covid-19
Previous Events
ID Date Leader Hours
7482020-05-23Dave Edwards30.0
7472020-05-21Barry Dydyk8.0
7452020-05-16Dave Edwards36.0
7442020-05-14Jerry Mitcham8.0
7422020-05-13Norm Simmonds24.0
7432020-05-12Jerry Mitcham9.0
7412020-05-11Dave Edwards24.0
7402020-05-08Dave Edwards18.0
7392020-05-06Jerry Mitcham12.0
7372020-05-04Jerry Mitcham13.5
7382020-05-04Dave Edwards13.5
7352020-04-30Jerry Mitcham12.0
7362020-04-28Don Brusselars8.0
7322020-04-28Barry Dydyk12.0
7302020-04-22Jerry Mitcham12.0
7312020-04-21Barry Dydyk13.5
6032018-11-03Jerry Mitcham54.0
5982018-10-06Dave Edwards72.0
5512018-03-17George Sherman42.0
5432018-02-03John Kross54.0
5172017-10-28Barry Dydyk48.0
3842016-01-30Greg Sweel54.5
Crew Member Hours
Barry Dydyk3.00
Don Brusselars3.00
Jerry Mitcham3.00
This was one of the specially scheduled COVID-19 trail maintenance projects. Since the park is closed on the weekends, we are only working on weekdays, with very small crews and practicing “social distancing”. We had 3 volunteers for this project. Met at the trailhead on Yerba Buena Road. Performed the GAR evaluation and conducted safety and tool talks. Hiked up the trail to the work site. Began work on that section of the trail below the connector to the Sandstone Peak Trail. This was one of the specially scheduled COVID-19 trail maintenance projects. Since the park is closed on the weekends, we are only working on weekdays, with very small crews and practicing “social distancing”. We had 3 volunteers for this project. Met at the trailhead on Yerba Buena Road. Performed the GAR evaluation and conducted safety and tool talks. Hiked up the trail to the work site. Began work on that section of the trail below the connector to the Sandstone Peak Trail. Installed two new drains. Filled approximately 30 feet of trenched tread. Due to ta light rain, we stopped work and began the hike down to the trailhead. Arrived back at the trailhead. Project complete. Total volunteer hours: 3 Volunteers x 3 hours = 9 hours Feet of trail maintained: 60 ft.