Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:748
Date: 2020-05-23
Agency:NPS
Trail: Mishe Mokwa Trail
Leader:Dave Edwards
Hours: 30
Volunteers:5
Distance:160
Status: Completed
Regulars: 5
Casuals: 0
pdf:20200523MisheMokwaTrail.pdf
CSUCI: 0
Tag:BBT,CIRCLE X,Covid-19
Previous Events
ID Date Leader Hours
7482020-05-23Dave Edwards30.0
7472020-05-21Barry Dydyk8.0
7452020-05-16Dave Edwards36.0
7442020-05-14Jerry Mitcham8.0
7422020-05-13Norm Simmonds24.0
7432020-05-12Jerry Mitcham9.0
7412020-05-11Dave Edwards24.0
7402020-05-08Dave Edwards18.0
7392020-05-06Jerry Mitcham12.0
7372020-05-04Jerry Mitcham13.5
7382020-05-04Dave Edwards13.5
7352020-04-30Jerry Mitcham12.0
7362020-04-28Don Brusselars8.0
7322020-04-28Barry Dydyk12.0
7302020-04-22Jerry Mitcham12.0
7312020-04-21Barry Dydyk13.5
6032018-11-03Jerry Mitcham54.0
5982018-10-06Dave Edwards72.0
5512018-03-17George Sherman42.0
5432018-02-03John Kross54.0
5172017-10-28Barry Dydyk48.0
3842016-01-30Greg Sweel54.5
Crew Member Hours
Dave Edwards6.00
George Sherman6.00
Greg Sweel6.00
John Kross6.00
Jon Sheldon6.00
Location: NPS-Mishe Mokwa trail Crewleader: Dave Edwards Summary: We began our hike to the work site at 7:30. Work was very much the same as last time out. A section of trail of about 60 feet was widened and smoothed by pulling in the outside berm and filling in a shallow trench resulting in a gentle out slope. A water drain was installed at the bottom of this section. A very large rock step was installed at the top of this section and a couple of additional rock steps were installed at the beginning of this section. The remaining section of trail up to the juncture of Mishe Mokwa and the Backbone connector trail was cleared of loose rocks and weeds. We arrived back at trailhead parking at 1:30. Crew size: 5 Hours worked: 6 Total hours: 30 Total feet of trail worked: 160 ft