Event#:751
Date: 2020-06-06
Agency:State Parks
Trail: Fireline Trail
Leader:Greg Sweel
Hours: 66
Volunteers:11
Distance:4963
Status: Completed
Regulars: 11
Casuals: 0
pdf:20200606FirelineTrail.pdf
CSUCI: 0
Tag:PMSP,Covid-19
Previous Events
ID Date Leader Hours
7522020-06-13Greg Sweel60.0
7512020-06-06Greg Sweel66.0
7282020-03-07Jerry Mitcham127.0
6322019-04-06Jerry Mitcham156.0
6252019-03-09John Kross186.0
3162015-04-18John Kross180.0
3142015-04-11Jerry Mitcham204.0
3052015-03-04Jerry Mitcham48.0
1032012-11-2460.0
42011-09-2848.0
312011-09-0348.0
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Dave Perlmutter6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
Jerry Mitcham6.00
John Kross6.00
Jon Sheldon6.00
Norm Simmonds6.00
Sharon Simmonds6.00
Arrive at the Day Use parking lot, sign-in, and shuttle five volunteers to the top of the trail on the Overlook Fire Road. The remaining 6 volunteers drove up Sycamore Canyon to the bottom of the trail. The upper crew used two hedge trimmers while the lower crew used a weed whacker and two hedge trimmers to clear brush and grasses. The remaining volunteers provided support to rake and remove the cuttings off the trail. The upper crew met the lower crew and we all hiked down the trail to the vehicles. Return tools and shuttle back to the Day Use parking lot. End of work day. 11 volunteers x 6 hours = 66 hours (see sign-in sheet). Upper Crew cleared 0.21 miles (1108 feet) of trail. Lower Crew cleared 0.73 miles (3854 feet) of trail. Total distance maintained = 0.94 miles (4963 feet). Total distance remaining = 0.57 miles (3010 feet).