Event#: | 754 |
Date: | 2020-06-24 |
Agency: | NPS |
Trail: | BBT - Latigo Canyon |
Leader: | Jerry Mitcham |
Hours: | 30 |
Volunteers: | 5 |
Distance: | 2100 |
Status: | Completed |
Regulars: | 5 |
Casuals: | 0 |
pdf: | 20200624BBT-Latigo.pdf |
CSUCI: | 0 |
Tag: | BBT,Covid-19 |
Previous Events
ID |
Date |
Leader |
Hours |
754 | 2020-06-24 | Jerry Mitcham | 30.0 |
753 | 2020-06-20 | Jerry Mitcham | 66.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Dave Edwards | 6.00 |
Dave Perlmutter | 6.00 |
Jerry Mitcham | 6.00 |
Jon Sheldon | 6.00 |
This was one of the specially scheduled COVID-19 trail maintenance projects and the second work day on this trail. Today, we had a crew of 5 SMMTC crewleaders. Our goal today was continue and complete brushing on this section of trail from our last outing here. This section of trail stretches trail from Latigo Canyon Road Trailhead to the Newton Motorway, a distance of 1.4 miles We previously completed.9 miles. Met at the Latigo Canyon Road trailhead. Conducted safety and tool talks. Hiked to the location of completion of the last outing's work (approximately.45 miles). Began work. Generally, the tread on this section of trail is in very good condition, so our work was almost entirely brushing, using power tools. Stopped work and began the hike/drive back to the trailhead. Arrived back at the meeting place. Project complete. We did not complete this section of trail. There is approximately 700 feet left to do. Total volunteer hours: 5 Volunteers x 6 hours = 30 hours Feet of trail maintained: 2, 100 ft.