× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew- Year by Year Totals Crew- Stats - XTAB Crew Accomplishments
Event#:788
Date: 2021-02-20
Agency:State Parks
Trail: BBT- Hondo Canyon
Leader:Greg Sweel
Hours: 42
Volunteers:7
Distance:2112
Status: Completed
Regulars: 7
Casuals: 0
pdf:20210220BBTHondo.pdf
CSUCI: 0
Tag:TSP, BBT
Previous Events
ID Date Leader Hours
7882021-02-20Greg Sweel42.0
7872021-02-13George Sherman42.0
7862021-02-06John Kross60.0
Crew Member Hours
Cindy Kimmick6.00
Dave Edwards6.00
George Sherman6.00
Greg Sweel6.00
John Kross6.00
Jon Sheldon6.00
Mark Simril7.00
Location: Backbone Trail – Lower Hondo Canyon - Topanga State Park Crewleader: Greg Sweel Summary: A crew of 7 met at Old Topanga Canyon Road at 8:30 AM. We discussed the safety precautions we’re to take for the COVID-19 pandemic and the anticipated work planned for the day. We then distributed the tools and split into a couple of groups, with one continuing to remove grass and brush with a battery-powered hedge trimmer, and the other hiking 1 mile to where we left off the previous week removing slough from the uphill side of the trail, widen/smooth the tread, cutting overhead branches and tree limbs, and cleaning water diversion drains. The day was cool, but sunny and breezy. We stopped work and hiked back to the meeting location. We cleared about 2112 feet or 0.4 mile of trail. This was our 3rd consecutive outing on this trail. Crew size: 7 Hours worked: 6 Total hours: 42 Total feet of trail worked: 2112 feet Crew Members: Dave Edwards, John Kross, Jon Sheldon, George Sherman, Greg Sweel, Cindy Kimmik, and Mark Simril