Event#: | 792 |
Date: | 2021-03-20 |
Agency: | State Parks |
Trail: | Hidden Pond Trail |
Leader: | Jerry Mitcham |
Hours: | 30 |
Volunteers: | 5 |
Distance: | 1690 |
Status: | Completed |
Regulars: | 5 |
Casuals: | 0 |
pdf: | 20210320HiddenPondTrail.pdf |
CSUCI: | 0 |
Tag: | PMSP |
Previous Events
ID |
Date |
Leader |
Hours |
800 | 2021-04-17 | Jerry Mitcham | 30.0 |
799 | 2021-04-10 | Jerry Mitcham | 24.0 |
794 | 2021-03-27 | Jerry Mitcham | 48.0 |
792 | 2021-03-20 | Jerry Mitcham | 30.0 |
778 | 2020-12-19 | Jerry Mitcham | 36.0 |
718 | 2020-01-18 | Don Brusselars | 45.0 |
717 | 2020-01-15 | George Sherman | 48.0 |
713 | 2020-01-04 | Barb Thomas | 90.0 |
708 | 2019-11-30 | Dave Edwards | 45.0 |
701 | 2019-10-26 | Dave Edwards | 48.0 |
697 | 2019-10-09 | Norm Simmonds | 36.0 |
692 | 2019-09-28 | Dave Edwards | 60.0 |
561 | 2018-04-27 | Dave Edwards | 24.0 |
302 | 2015-02-25 | Norm Simmonds | 48.0 |
298 | 2015-02-18 | Norm Simmonds | 36.0 |
292 | 2015-01-28 | Jerry Mitcham | 48.0 |
291 | 2015-01-24 | Dave Edwards | 48.0 |
289 | 2015-01-21 | Norm Simmonds | 48.0 |
287 | 2015-01-14 | Norm Simmonds | 38.5 |
282 | 2015-01-03 | Greg Sweel | 54.0 |
273 | 2014-11-19 | Norm Simmonds | 48.0 |
152 | 2013-06-22 | | 36.0 |
Crew Member |
Hours |
Anne Russell | 6.00 |
Barry Dydyk | 6.00 |
Don Brusselars | 6.00 |
Jerry Mitcham | 6.00 |
Norm Simmonds | 6.00 |
This was one of the specially scheduled COVID-19 trail maintenance projects. The goal of this project was to perform routine trail maintenance on the Hidden Pond Trail. We had 5 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the Hidden Pond trail head in on Ranch Center Road. Began work. Used the power tool to trim brush back to the standard 8’ width. Installed two new large drains and several smaller ones. Filled in many feet of trenches in the trail. Established a 40 foot realignment. Stopped work and began hike back to the trail head. . Arrived back at the meeting place. Project complete. Jerry M, Anne R, Norm S,Don B, Barry D. Total volunteer hours: 5 Volunteers x 6 hours = 30 hours Feet of trail maintained: 1690 ft.