Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:800
Date: 2021-04-17
Agency:State Parks
Trail: Hidden Pond Trail
Leader:Jerry Mitcham
Hours: 30
Volunteers:5
Distance:570
Status: Completed
Regulars: 5
Casuals: 0
pdf:20210417HiddenPondTrail.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8002021-04-17Jerry Mitcham30.0
7992021-04-10Jerry Mitcham24.0
7942021-03-27Jerry Mitcham48.0
7922021-03-20Jerry Mitcham30.0
7782020-12-19Jerry Mitcham36.0
7182020-01-18Don Brusselars45.0
7172020-01-15George Sherman48.0
7132020-01-04Barb Thomas90.0
7082019-11-30Dave Edwards45.0
7012019-10-26Dave Edwards48.0
6972019-10-09Norm Simmonds36.0
6922019-09-28Dave Edwards60.0
5612018-04-27Dave Edwards24.0
3022015-02-25Norm Simmonds48.0
2982015-02-18Norm Simmonds36.0
2922015-01-28Jerry Mitcham48.0
2912015-01-24Dave Edwards48.0
2892015-01-21Norm Simmonds48.0
2872015-01-14Norm Simmonds38.5
2822015-01-03Greg Sweel54.0
2732014-11-19Norm Simmonds48.0
1522013-06-2236.0
Crew Member Hours
Barry Dydyk6.00
Don Brusselars6.00
Jerry Mitcham6.00
Mike Epler6.00
Norm Simmonds6.00
This was one of the specially scheduled COVID-19 trail maintenance projects. The goal of this project was to perform routine trail maintenance on the La Jolla Canyon Trail. We had 5 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the northern La Jolla Canyon trail head, off of the La Jolla Valley Loop Trail (Service Road). Began work. Used the power tool to trim brush back to the standard 8’ width. Performed maintenance on a total of 570 ft. of trail. Tread work consisted of primarily of removing roots and stumps from the trail. We found moderately heavy brush consisting of a mix of deer weed, sage misc other brush and grasses. We skipped over about 350 feet of trail which was only tall grass. We will bring a weed whacker next week and take care of these stretches. Going forward from where we left off there is a lot of brushing to be done. The tread is only about two feet wide, but in good shape.. Stopped work. Hiked back to the trail head, then carpooled back to the meeting place. . Arrived back at the meeting place. Project complete. Total volunteer hours: 5 Volunteers x 6 hours = 30 hours Feet of trail maintained: 570 ft. Jerry, Don, Barry, Mike, Norm