Event#: | 800 |
Date: | 2021-04-17 |
Agency: | State Parks |
Trail: | Hidden Pond Trail |
Leader: | Jerry Mitcham |
Hours: | 30 |
Volunteers: | 5 |
Distance: | 570 |
Status: | Completed |
Regulars: | 5 |
Casuals: | 0 |
pdf: | 20210417HiddenPondTrail.pdf |
CSUCI: | 0 |
Tag: | PMSP |
Previous Events
ID |
Date |
Leader |
Hours |
800 | 2021-04-17 | Jerry Mitcham | 30.0 |
799 | 2021-04-10 | Jerry Mitcham | 24.0 |
794 | 2021-03-27 | Jerry Mitcham | 48.0 |
792 | 2021-03-20 | Jerry Mitcham | 30.0 |
778 | 2020-12-19 | Jerry Mitcham | 36.0 |
718 | 2020-01-18 | Don Brusselars | 45.0 |
717 | 2020-01-15 | George Sherman | 48.0 |
713 | 2020-01-04 | Barb Thomas | 90.0 |
708 | 2019-11-30 | Dave Edwards | 45.0 |
701 | 2019-10-26 | Dave Edwards | 48.0 |
697 | 2019-10-09 | Norm Simmonds | 36.0 |
692 | 2019-09-28 | Dave Edwards | 60.0 |
561 | 2018-04-27 | Dave Edwards | 24.0 |
302 | 2015-02-25 | Norm Simmonds | 48.0 |
298 | 2015-02-18 | Norm Simmonds | 36.0 |
292 | 2015-01-28 | Jerry Mitcham | 48.0 |
291 | 2015-01-24 | Dave Edwards | 48.0 |
289 | 2015-01-21 | Norm Simmonds | 48.0 |
287 | 2015-01-14 | Norm Simmonds | 38.5 |
282 | 2015-01-03 | Greg Sweel | 54.0 |
273 | 2014-11-19 | Norm Simmonds | 48.0 |
152 | 2013-06-22 | | 36.0 |
Crew Member |
Hours |
Barry Dydyk | 6.00 |
Don Brusselars | 6.00 |
Jerry Mitcham | 6.00 |
Mike Epler | 6.00 |
Norm Simmonds | 6.00 |
This was one of the specially scheduled COVID-19 trail maintenance projects. The goal of this project was to perform routine trail maintenance on the La Jolla Canyon Trail. We had 5 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the northern La Jolla Canyon trail head, off of the La Jolla Valley Loop Trail (Service Road). Began work. Used the power tool to trim brush back to the standard 8’ width. Performed maintenance on a total of 570 ft. of trail. Tread work consisted of primarily of removing roots and stumps from the trail. We found moderately heavy brush consisting of a mix of deer weed, sage misc other brush and grasses. We skipped over about 350 feet of trail which was only tall grass. We will bring a weed whacker next week and take care of these stretches. Going forward from where we left off there is a lot of brushing to be done. The tread is only about two feet wide, but in good shape.. Stopped work. Hiked back to the trail head, then carpooled back to the meeting place. . Arrived back at the meeting place. Project complete. Total volunteer hours: 5 Volunteers x 6 hours = 30 hours Feet of trail maintained: 570 ft. Jerry, Don, Barry, Mike, Norm