Event#:801
Date: 2021-04-17
Agency:State Parks
Trail: Old Boney Trail
Leader:George Sherman
Hours: 42
Volunteers:6
Distance:1100
Status: Completed
Regulars: 6
Casuals: 0
pdf:20210417OldBoneyTrail.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8012021-04-17George Sherman42.0
7982021-04-10Greg Sweel42.0
7962021-04-03Dave Edwards91.0
7952021-03-27John Kross49.0
7932021-03-20Greg Sweel42.0
7912021-03-13Dave Edwards78.0
7902021-03-06John Kross65.0
7892021-02-27George Sherman56.0
7202020-02-01Barry Dydyk54.0
6962019-10-06George Sherman12.0
6952019-10-05George Sherman66.0
6932019-09-29George Sherman6.0
6902019-09-25George Sherman30.0
6892019-09-22George Sherman6.0
6882019-09-18George Sherman53.0
6912019-09-15George Sherman5.0
6872019-09-14George Sherman50.0
6862019-09-08George Sherman6.0
6842019-08-31George Sherman12.0
6832019-08-25George Sherman5.0
6822019-08-24George Sherman18.0
6812019-08-18George Sherman5.0
6792019-08-11George Sherman6.0
6782019-08-10George Sherman6.0
5402018-01-17Norm Simmonds24.0
5322017-12-02George Sherman54.0
5082017-09-23Greg Sweel60.0
5072017-09-16John Kross42.0
4492016-12-07Norm Simmonds35.0
4072016-05-11Norm Simmonds36.0
3852016-02-20Jerry Mitcham66.0
3692015-12-09Norm Simmonds54.0
3642015-11-11Norm Simmonds48.0
1622013-04-2074.0
1392013-04-1354.0
1302013-03-0954.0
1242013-02-096.0
1232013-01-2354.0
1092013-01-0542.0
1062012-12-1537.5
832012-10-1348.0
802012-09-2456.0
792012-09-2266.0
772012-09-1945.5
682012-06-2348.0
Crew Member Hours
Dave Edwards7.00
George Sherman7.00
Greg Sweel7.00
John Kross7.00
Jon Sheldon7.00
Mark Simril7.00
This was one of the specially scheduled COVID-19 trail maintenance projects. The goal of this project was to perform routine trail maintenance on Old Boney Trail. We had 6 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the top of the Sycamore Canyon Blacktop. Began work. Used the power tool to trim brush back to the standard 8’ width. Performed maintenance on a total of 1100 ft. of trail. Tread work consisted primarily of the removal of encroaching brush from the trail. Several drains were cleaned and reshaped. Loose rocks were cleared from the trail. This concludes our efforts on the Old Boney Trail. Stopped work. Hiked back to the trail head, then carpooled back to the meeting place. Arrived back at the meeting place. Project complete. Total volunteer hours: 6 Volunteers x 7 hours = 42 hours Feet of trail maintained: 570 ft. George, Dave, Jon, John, Greg, Mark