Event#:802
Date: 2021-04-24
Agency:State Parks
Trail: La Jolla Valley Trail
Leader:Jerry Mitcham
Hours: 66
Volunteers:11
Distance:1670
Status: Completed
Regulars: 10
Casuals: 1
pdf:20210424LaJollaCynTrail.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8142021-06-19Greg Sweel49.0
8132021-06-12Jerry Mitcham103.5
8122021-06-05Don Brusselars66.0
8112021-05-29John Kross72.0
8052021-05-08Jerry Mitcham18.0
8032021-05-01John Kross72.0
8022021-04-24Jerry Mitcham66.0
272012-01-1145.5
Crew Member Hours
Barry Dydyk6.00
Dave Edwards6.00
Dave Perlmutter6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
Jerry Mitcham6.00
John Kross6.00
Jon Sheldon6.00
Norm Simmonds6.00
Rolf Henriksson6.00
This was one of the specially scheduled COVID-19 trail maintenance projects. Today, our two crews of the last few weeks joined to work together. The goal of this project was to perform routine trail maintenance on the La Jolla Canyon Trail. We had 11 volunteers for the project. Met at the trail head at Wendy Drive and Potrero Road. Carpooled to the northern La Jolla Valley group camp area. Began work at the point where the crew left off last week. Used the power tools to trim brush back to the standard 8’ width. Performed maintenance on a total of 1,670 ft. of trail. Tread work consisted of primarily of removing roots and stumps from the trail. We found moderately heavy brush consisting of a mix of deer weed, sage misc other brush and grasses. We cut the grasses we skipped over last week Going forward from where we left off there is a lot of brushing to be done. The tread is only about two feet wide, but in good shape.. Stopped work. Hiked back to the trail head, then carpooled back to the meeting place. . Arrived back at the meeting place. Project complete. Total volunteer hours: 11 Volunteers x 6 hours = 66 hours Feet of trail maintained: 1,670 ft.