Event#:803
Date: 2021-05-01
Agency:State Parks
Trail: La Jolla Valley Trail
Leader:John Kross
Hours: 72
Volunteers:10
Distance:2600
Status: Completed
Regulars: 10
Casuals: 0
pdf:20210501LaJollaValleyLoop.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8142021-06-19Greg Sweel49.0
8132021-06-12Jerry Mitcham103.5
8122021-06-05Don Brusselars66.0
8112021-05-29John Kross72.0
8052021-05-08Jerry Mitcham18.0
8032021-05-01John Kross72.0
8022021-04-24Jerry Mitcham66.0
272012-01-1145.5
Crew Member Hours
Carlyn Taggart7.00
Cindy Kimmick7.00
Dave Edwards7.00
George Sherman7.00
Greg Sweel7.00
John Kross9.00
Jon Sheldon7.00
Mark Simril7.00
Mike Epler7.00
Roger Young7.00
Ten of us met at the Wendy trailhead and proceeded to shuttle into Sycamore Canyon in three vehicles, Mike Epler with his Nissan Xterra, and Dave Edwards and I with our 4wd trucks. Participants in addition to Mike, Dave and myself were: George Sherman, Jon Sheldon, Cindy Kimmick, Carlin Taggart Greg Sweel, Mark Simril, and Roger Young, who was still recovering from the 100 miler he ran just a week ago. We stopped at the Upper Sycamore Canyon trailhead to take out a large tree that was blocking the trail about 3/10 miles from the trailhead. Then we proceeded to La Jolla Valley We parked and hiked 1.7 miles to our work area. Work consisted of taking out another good size tree, treadwork, brushing with two brush cutters as well as with McLeods, moving about 120 feet of trail onto the berm, and installing one drain. From the starting point three worked their way back, Mark jumped ahead to the Mugu Peak trail, and the rest of us worked in the direction of the Mugu Peak trail. There is still a lot of work to be done in this area, we haven’t worked on the Mugu Peak trail and the La Jolla Valley loop trails around it in many years. We stashed the tools and hiked back Shuttled back to our cars Everyone left Total volunteer hours: 10 volunteers x 7 hours = 70 hours Feet of trail maintained: 2,600