Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:812
Date: 2021-06-05
Agency:State Parks
Trail: La Jolla Valley trails, Point Mugu State Park
Leader:Don Brusselars
Hours: 66
Volunteers:11
Distance:2112
Status: Completed
Regulars: 11
Casuals: 0
pdf:20210605LaJollaValleyLoop.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8152021-06-26Dave Edwards67.0
8142021-06-19Greg Sweel49.0
8132021-06-12Jerry Mitcham103.5
8122021-06-05Don Brusselars66.0
8112021-05-29John Kross72.0
Crew Member Hours
Barry Dydyk6.00
Cindy Kimmick6.00
Dave Edwards6.00
Dave Perlmutter6.00
Don Brusselars6.00
George Sherman6.00
Greg Sweel6.00
Jerry Mitcham6.00
John Kross6.00
Jon Sheldon6.00
Rolf Henriksson6.00
Ten of us met at the Wendy trailhead and proceeded to shuttle into Sycamore Canyon in three pickup trucks. Jon Sheldon hiked in and met us at the work area After driving past Walk-in camps on the La Jolla Fire Road, one truck parked by the pond trail and three of us took a brush cutter and McLeods to go to the La Jolla Loop trail and started working north. The remaining trucks proceeded to the previous week’s work area on the La Jolla Valley Center Trail, and after retrieving the cached tools finished the trail work there. Then, they proceeded to join the group on the Loop trail and work south from the intersection with the pond trail., brushing and also improving the tread where needed. Brush was generally thick and had narrowed the trail to about 2 feet We cleared about 0.4 mile (total for both locations) On the way back one group stopped at the walk-in camp, replaced the maps in the kiosk and tightened the bolts holding the display case – they had gotten loose and the sign was swaying. There is still work to be done in this area, next Saturday we will continue working on the La Jolla Canyon trail. Also, a group of boy scouts will join us and will probably work on the Pond trail. We hiked back to the trucks Shuttled back to our cars Event Concluded Total volunteer hours: 11 volunteers x 6 hours = 66 hours Feet of trail maintained: 2,112