Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:813
Date: 2021-06-12
Agency:State Parks
Trail: La Jolla Valley trails, Point Mugu State Park
Leader:Jerry Mitcham
Hours: 103
Volunteers:18
Distance:2350
Status: Completed
Regulars: 13
Casuals: 5
pdf:20210612LaJollaValleyTrails.pdf
CSUCI: 0
Tag:PMSP
Previous Events
ID Date Leader Hours
8152021-06-26Dave Edwards67.0
8142021-06-19Greg Sweel49.0
8132021-06-12Jerry Mitcham103.5
8122021-06-05Don Brusselars66.0
8112021-05-29John Kross72.0
Crew Member Hours
Anne Russell5.00
Barb Thomas5.00
Barry Dydyk5.00
Dave Edwards6.50
Dave Perlmutter6.50
Don Brusselars5.00
George Sherman6.50
Greg Sweel6.50
Jerry Mitcham5.00
John Kross6.50
Jon Sheldon6.50
Mike Epler5.00
Roger Young6.50
This was a continuation of the La Jolla Valley Trail maintenance project. Today We were joined by a group of three trail runners and a group of ten scouts/adults. The crew was divided into two groups. The first group consisting of a group of SMMTC volunteers and the trail runners met at the Wendy Potrero trail head at 8:00. The second group consisting of SMMTC volunteers and the scout group met at 8:30 AM. The goal of this project was to perform routine trail maintenance on the La Jolla Valley trails. We had a total of 18 volunteers for the project. A group of SMMTC volunteers and three trail runners met at the Wendy/Potrero Trailhead. The group carpooled to the La Jolla Valley. The first group of volunteers began work. Three volunteers began brushing the Pond trail with three power brush trimers. The remaining part of the crew hiked in to the Loop trail and began work where they left off last week. This group maintained a total of 1,300 feet of the Loop Trail. A group of five SMMTC volunteers and a group of ten scouts/ (seven scouts and three adults) met at the trail head at Wendy Drive and Potrero Road. Carpooled to the La Jolla Valley area. Parked just west of the La Jolla campground. Conducted tool and safety briefings. Began work. The crew cleaned up the cuttings left by the earlier brush cutters, cleaned out three large drains and removed a lot of slough from much of the trail. Completed work on the pond trail. The crew had lunch in the campground. This group maintained 1,100 feet of trail. Crew finished lunch and began work in the campground. Trails and campsites around the group camp were brushed. Trash was removed from the food boxes and surrounding area. Removed all fire pits. Completed work and returned to the meeting place. Group two arrived back at the meeting place. Project complete. Group one completed work and hiked back to the vehicles. Carpooled back to meeting place Group one arrived back at the meeting place. Project complete. Total volunteer hours: 9 Volunteers x 6.5