Event#: | 813 |
Date: | 2021-06-12 |
Agency: | State Parks |
Trail: | La Jolla Valley trails, Point Mugu State Park |
Leader: | Jerry Mitcham |
Hours: | 103 |
Volunteers: | 18 |
Distance: | 2350 |
Status: | Completed |
Regulars: | 13 |
Casuals: | 5 |
pdf: | 20210612LaJollaValleyTrails.pdf |
CSUCI: | 0 |
Tag: | PMSP |
Previous Events
ID |
Date |
Leader |
Hours |
815 | 2021-06-26 | Dave Edwards | 67.0 |
814 | 2021-06-19 | Greg Sweel | 49.0 |
813 | 2021-06-12 | Jerry Mitcham | 103.5 |
812 | 2021-06-05 | Don Brusselars | 66.0 |
811 | 2021-05-29 | John Kross | 72.0 |
Crew Member |
Hours |
Anne Russell | 5.00 |
Barb Thomas | 5.00 |
Barry Dydyk | 5.00 |
Dave Edwards | 6.50 |
Dave Perlmutter | 6.50 |
Don Brusselars | 5.00 |
George Sherman | 6.50 |
Greg Sweel | 6.50 |
Jerry Mitcham | 5.00 |
John Kross | 6.50 |
Jon Sheldon | 6.50 |
Mike Epler | 5.00 |
Roger Young | 6.50 |
This was a continuation of the La Jolla Valley Trail maintenance project. Today We were joined by a group of three trail runners and a group of ten scouts/adults. The crew was divided into two groups. The first group consisting of a group of SMMTC volunteers and the trail runners met at the Wendy Potrero trail head at 8:00. The second group consisting of SMMTC volunteers and the scout group met at 8:30 AM. The goal of this project was to perform routine trail maintenance on the La Jolla Valley trails. We had a total of 18 volunteers for the project.
A group of SMMTC volunteers and three trail runners met at the Wendy/Potrero Trailhead. The group carpooled to the La Jolla Valley.
The first group of volunteers began work. Three volunteers began brushing the Pond trail with three power brush trimers. The remaining part of the crew hiked in to the Loop trail and began work where they left off last week. This group maintained a total of 1,300 feet of the Loop Trail.
A group of five SMMTC volunteers and a group of ten scouts/ (seven scouts and three adults) met at the trail head at Wendy Drive and Potrero Road. Carpooled to the La Jolla Valley area.
Parked just west of the La Jolla campground. Conducted tool and safety briefings. Began work. The crew cleaned up the cuttings left by the earlier brush cutters, cleaned out three large drains and removed a lot of slough from much of the trail.
Completed work on the pond trail. The crew had lunch in the campground. This group maintained 1,100 feet of trail.
Crew finished lunch and began work in the campground. Trails and campsites around the group camp were brushed. Trash was removed from the food boxes and surrounding area. Removed all fire pits.
Completed work and returned to the meeting place.
Group two arrived back at the meeting place. Project complete.
Group one completed work and hiked back to the vehicles. Carpooled back to meeting place
Group one arrived back at the meeting place. Project complete.
Total volunteer hours:
9 Volunteers x 6.5