Single Event Record Display
× Home Crew Stats-old version Trail Stats Work Schedule Agency Report by Years Crew - Year by Year Totals Crew - Stats - XTAB Crew Accomplishments
Event#:885
Date: 2022-06-04
Agency:NPS
Trail: National Trails Days
Leader:Barb Thomas
Hours: 49
Volunteers:11
Distance:4300
Status: Completed
Regulars: 11
Casuals: 0
pdf:20220604NationalTrailDays.pdf
CSUCI: 0
Tag:NPS
Previous Events
ID Date Leader Hours
8852022-06-04Barb Thomas49.5
6502019-05-28Jerry Mitcham8.0
Crew Member Hours
Anne Russell4.50
Barb Thomas4.50
Carlyn Taggart4.50
Dave Edwards4.50
Don Brusselars4.50
George Sherman4.50
Greg Sweel4.50
Jerry Mitcham4.50
John Kross4.50
Jon Sheldon4.50
Ruth Feldon4.50
Met at Peter Strauss. TC crew leaders led crews on work on the loop trail above the amphitheater and the Malibu Connector Trail. Loop trail was completed (clearing and hiding cut brush, grubbing roots, opening existing drains. The heavily overgrown (star thistle, poison oak, mustard) Malibu connector trail was brushed to the end in conjunction with Sierra Club and other volunteers. Below is the summary from NPS. Cactus Garden was cleaned up Amp seating was cleaned (19 large trash bags of duff) Peter Strauss Loop trail was completed Malibu Lake Connector trail had some work done (not sure how far folks got) Some more of the grounds were tidied upĀ  We had a total of 35 trash bags of duff and other materials removed on Sat! Estimated trail clearance: Loop: 1/3 mile, MC: 1/2 mile: ~4300 feet 11 TC Volunteers plus general public and Sierra Club TC Volunteers: Barb Thomas, Jerry Mitcham, Ruth Feldon, Carlyn Taggart, Anne Russell, Dave Edwards, Don Brusselars, John Kross, George Sherman, Jon Sheldon, Greg Sweel